At Dattaguru Industries, Quality
is our Commitment.
The true measure
of our Quality is the degree to which our customers
express satisfaction with our products and services
through long-term business relationships.
Our industry is characterized
by intense competition. The quality of our products
and the quality of our service to our customers are
the most important deciding factors between winning
and losing business.
Lab
Facility
Sr.
No.
Instruments
Method
1.
Tensile
UTS
Elongation
UTS
Reduction
UTS
2.
Micro
Structure
Microscope
Decarb
Checking
Microscope
3.
Radius
Checking
Shadow
graph
4.
Torque
Test
Torque
Tester
5.
Salt
Spray
Salt
Spray Chamber
White
Rust
Red
Rust
6.
Plating
Thickness
Thickness
Tester
7.
pH
Test
pH
Meter
8.
Bath
Test
Chemical
Analysis
Our
Testing Equipments
Sr.
No.
Description
of Machines
Capacity
Quantity
1.
Micrometer
0 to
25 mm
36
2.
Vernier
Caliper
0 to
150 mm
38
3.
Hardness
Tester
Rockwell
3
4.
Hardness
Tester
Vickers
Hardness
1
5.
Torque
Tester
AVT
100-1200
3
6.
Dial
Indicator
Mitutoyo
Antimagnetic
1
7.
UTS
Precision
1
8.
Microscope
INBT
2
1
9.
pH Meter
EQ 611
1
10.
Plating
Thickness Tester
Sidet
Simple Destructive
1
11.
Platform
Weighing Machine
5-300
Kg
3
12.
Electronic
Weighing Machine
Settra/
500 Kg
1
13.
Shadow
Graph
Leitz
Metzlar
1
14.
Filler
Gauge
1 Set
17.
Pitch
Micrometer
Mitutyo
2
18.
Gauge
Go-No Go
HIP
3-14 mm
38
Quality
Control Methods / Steps Involved in Quality Control
Raw material is received from the supplier
along with test certificate of chemical
composition & mechanical properties.
Raw material is sent to the processing
department. Processing department. After
checking the Raw material as per inspection
plan production supervisor allows the
machine operator to load material on machine.
1st Off Inspection:- After the machine
is set for the required products 5 pieces
are checked and are being approved by
the QC supervisor.
Inprocess Inspection:- Machine is set
for production after the approval of 1st
off inspection. The operator with the
measuring instrument does inprocess inspection
of the product at regular intervals.
1st Off Inspection and Inprocess Inspection
methods are used on all production process.
Heat treatment process is to ensure
core and case hardness of the product
through established cycle.
Inspection is carried out in every batch
for hardness.
Final inspection:- After all the operations
are completed and before the product is
send for packing, random checking is done
to confirm quality of the product.
Following checking is carried out for
final inspection :
Dimensional checks as per inspection
plan (digital caliper, micrometer &
gauges)
Visual checks
Packing:- After the final inspection
the material is send to packing department
each item is labeled and mentioned with
specific sizes / drawing no. total weights
and number of pieces per packet material
is packed in plastics bags or as instructed
by the clients.
Third party inspection if needed can